Product · ENERMAX PIR™

Pre-Insulated HVAC Duct Systems

Our pre-insulated ductwork is manufactured under the ENERMAX PIR™ brand — a rigid closed-cell insulation panel that serves as both the air duct and the thermal insulation, engineered for low leakage, low weight and fast installation.

Overview

The Duct and the Insulation Are the Same Component

Conventional HVAC ductwork is built in two operations. A sheet-metal contractor fabricates and installs galvanised steel duct; an insulation contractor then wraps or lines it. Two trades, two programmes, two sets of joints and a thermal envelope whose quality depends on how carefully the second trade worked around hangers, flanges and tight ceiling voids.

A pre-insulated duct collapses those two operations into one. Clima Tech manufactures rigid, closed-cell insulation panel faced on both sides with a protective metal facing. That panel is precision-cut, grooved, folded and sealed into rectangular duct sections and fittings. The finished duct is simultaneously the pressure boundary, the air path and the insulation layer.

Because the insulation is continuous through the duct wall, thermal bridging at joints and supports is minimised by design rather than corrected on site.

Our duct systems are supplied under the ENERMAX PIR™ brand. The core is rigid closed-cell polyisocyanurate; the facings are embossed aluminium foil on both sides, acting as a vapour barrier on the outside and a smooth, fibre-free surface on the inside.

Pre-insulated duct section and elbow showing the rigid closed-cell PIR core between aluminium facings
The panel wall is the duct wall. A single rigid section carries the air, holds the pressure and provides the thermal performance.
0.020 W/m·K
ENERMAX PIR™ conductivity
Up to 4 m
Duct section length
1.36 kg/m²
EX 20P panel weight
Fibre-Free
Clean air path

Construction

How the Panel Is Built

Every layer has a job. Understanding what each one does makes it easier to specify the right configuration for your project.

Outer Facing — Aluminium Foil or PPGI
Rigid Closed-Cell PUF / PIR Insulation Core
Inner Facing — Aluminium Foil or PPGI

ENERMAX PIR™ uses embossed aluminium foil on both faces over a polyisocyanurate core.

Rigid closed-cell foam core
PUF or PIR at a nominal density of 40 ± 2 kg/m³ (45–50 kg/m³ for ENERMAX PIR™). The closed-cell structure resists moisture migration and gives the panel the rigidity to act as a structural duct wall.
Outer facing
Aluminium foil or PPGI. Acts as the vapour barrier, protects the core during handling and installation, and provides the external appearance where ductwork is exposed.
Inner facing
A smooth metal surface in contact with the airstream. Nothing fibrous is exposed, so there is no erosion of insulation into the air path and internal surfaces can be wiped down.
Precision cutting and grooving
Panels are cut and V-grooved to the duct dimensions taken off the drawings, then folded to form the corners — producing a section with only one longitudinal seam.
Jointing and sealing
Approved jointing profiles, vapour-sealing tape and sealant close the seams and transverse joints. Reinforcement and supports are specified according to duct size and operating pressure.

Key Benefits

Why Specifiers Choose Pre-Insulated Ductwork

High Thermal Efficiency

A low-conductivity closed-cell core — 0.020 W/m·K in ENERMAX PIR™ — keeps conditioned air at temperature along the run, reducing reheat and lowering lifecycle energy demand.

Lower Installed Weight

Markedly lighter than GI duct with applied insulation. Fewer and lighter supports, easier handling at height, less structural allowance for services.

Reduced Air Leakage

Longer sections mean fewer transverse joints, and sealed folded corners remove much of the seam length found in fabricated sheet metal.

Faster Installation

One trade, one product, one operation. There is no separate lagging programme to sequence and no wrapping for following trades to damage.

Corrosion-Resistant Facings

Aluminium foil or PPGI facings resist the humidity and condensation risk found around chilled-water air distribution.

Fibre-Free Air Path

No fibrous insulation is exposed to the airstream — important for hospitals, cleanrooms, pharmaceutical and food-processing environments.

Technical Data

Indicative Specification

The figures below cover our general pre-insulated duct range. For the full ENERMAX PIR™ engineering envelope — panel weights, densities, pressure limits, velocity limits and temperature range for EX 20P and EX 30P — see the dedicated technical data page.

ENERMAX PIR™ technical data

Pre-insulated duct — indicative properties
ParameterValue
Insulation materialPUF / PIR rigid foam
Foam density40 ± 2 kg/m³
Thermal conductivity≤ 0.022 W/mK
Panel thickness20 / 25 / 30 mm
Facing optionsAluminium foil / PPGI

Values indicative — confirm against approved datasheets.

Competitive Advantage

Pre-Insulated Duct vs. Conventional GI Ductwork

A direct comparison highlights the key advantages of the Clima Tech integrated pre-insulated duct system over conventional GI duct with external insulation.

Conventional GI Duct

Sheet metal plus applied insulation

  • Multiple installation stages — fabricate, install, then insulate as a separate trade
  • Heavier system weight — steel duct plus insulation plus cladding
  • Thermal bridging risk at joints — flanges, hangers and stiffeners interrupt the insulation
  • Slower fabrication & install — two programmes to sequence and coordinate
Clima Tech ENERMAX PIR™

Single integrated system

  • Single integrated system — the panel is both duct and insulation
  • Lower installed weight — from 1.36 kg/m² of panel
  • Thermal bridging minimised by design — continuous core through the duct wall
  • Faster fabrication & install — one trade, one operation, longer sections

On Site

How It Goes In

Installation follows our current method statement. The sequence below is typical; site-specific details such as support spacing, reinforcement and penetrations are confirmed during technical coordination.

Step 01

Take-off & panel cutting

Duct sizes are taken from coordinated drawings and panels are cut and V-grooved to suit each section and fitting.

Step 02

Folding & corner forming

Grooved panels are folded into rectangular sections, leaving a single longitudinal seam per length.

Step 03

Sealing

Seams and transverse joints are closed with approved jointing profiles, vapour-sealing tape and sealant.

Step 04

Reinforcement & supports

Reinforcement and support spacing are applied according to duct size and the design pressure class.

Step 05

Inspection

Dimensional accuracy, joint integrity and support spacing are checked before the ceiling is closed.

Technicians positioning a pre-insulated duct branch by hand, without lifting plant
Low panel weight means duct sections can be positioned and supported with less lifting plant than equivalent GI ductwork.

Suggested Specification

Provide ENERMAX PIR™ pre-insulated rectangular HVAC ductwork from aluminium-faced rigid closed-cell PIR panels, with approved jointing profiles, vapour-sealing tape, sealant, reinforcement and supports. Installation per manufacturer’s current method statement.

Where It Is Used

Recommended Applications

Supply, return, fresh-air and exhaust ductwork within the validated pressure, velocity and temperature envelope.

Suited to

  • Commercial buildings
  • Hospitals and clean areas
  • Food and beverage facilities
  • Pharmaceutical environments
  • Data centres
  • Hotels
  • Light industrial buildings
  • High-humidity spaces

Not intended for

  • Kitchen grease extract
  • Smoke extract or fire-rated ductwork
  • Chemical fumes
  • Solid-particle conveying
  • Temperatures outside the validated range
  • Uncontrolled process exhaust

See sector-by-sector applications

Calculated Data

What the Numbers Mean in Practice

Conductivity on a datasheet is a material property. These figures convert it into the thermal resistance and installed weight your design actually has to work with.

Thermal resistance of the duct wall

Minimum R-value of the insulation layer, calculated as thickness ÷ thermal conductivity. Higher is better. ENERMAX PIR™ grades are highlighted; the general duct range is shown for context.

ENERMAX PIR™ EX 20P
1.00
ENERMAX PIR™ EX 30P
1.50
Duct panel 20 mm
0.91
Duct panel 25 mm
1.14
Duct panel 30 mm
1.36
R-value in m²K/W · bars scaled to the largest value
ENERMAX PIR™ — calculated thermal resistance (λ = 0.020 W/m·K)
Core thickness R-value (m²K/W) U-value (W/m²K) R-value (imperial)
20 mm1.001.005.68
30 mm1.500.678.52

Calculated as R = thickness ÷ λ and U = 1 ÷ R for the insulation layer alone. Surface resistances, the aluminium facings and any air films are excluded, so a built-up assembly will differ. Imperial R-value in h·ft²·°F/BTU.

Weight in context

ENERMAX PIR™ panel weighs 1.36 kg/m² (EX 20P) or 1.90 kg/m² (EX 30P) of duct surface. By material density alone, plain 0.6 mm galvanised steel sheet works out at roughly 4.7 kg/m² (7,850 kg/m³ × 0.6 mm) — before any insulation, vapour barrier, cladding, flanges or stiffeners are added. The comparison is indicative arithmetic on the bare sheet, not a like-for-like test of two finished systems, but it shows why support and hanger design differs so much between the two approaches.

Panel take-off and sizing tables

Pre-Insulated Duct FAQs

Common questions from consultants, contractors and facility teams evaluating pre-insulated ductwork.

What is a pre-insulated duct?

A pre-insulated duct is ductwork in which the insulation is the structural material. Instead of fabricating a galvanised steel duct and then wrapping or lining it with insulation on site, a rigid closed-cell foam panel faced on both sides with aluminium or PPGI is cut, grooved, folded and sealed into duct sections. The finished duct carries the air, resists the pressure and provides the thermal performance in one component.

Is ENERMAX PIR™ lighter than GI ductwork?

Yes, substantially. ENERMAX PIR™ panel weighs 1.36 kg/m² in 20 mm (EX 20P) and 1.90 kg/m² in 30 mm (EX 30P). Lower installed weight reduces support and hanger loads, eases handling at height and can simplify the structural allowance for services.

How long are the duct sections?

Panels are supplied at 4000 × 1200 mm and duct sections can be made up to 4 m long. Longer sections mean fewer transverse joints across a run, which reduces the number of potential leakage paths and speeds installation.

Is the system fibre-free?

Yes. The core is a rigid closed-cell polyisocyanurate foam, not a fibrous insulant, and both faces are aluminium. There is no exposed fibrous material in the air path, which is a common requirement in hospitals, cleanrooms, pharmaceutical facilities and food and beverage plants.

What pressure and velocity can it handle?

EX 20P is rated for 1000 Pa and up to 15 m/s; EX 30P for 1750 Pa and up to 35 m/s. Both operate across an air temperature range of −25 °C to +80 °C. Full figures are on the ENERMAX PIR™ technical data page.

Where should the system not be used?

ENERMAX PIR™ is not intended for kitchen grease extract, smoke extract or fire-rated ductwork, chemical fumes, solid-particle conveying, uncontrolled process exhaust, or air temperatures outside the validated range. We state this clearly so specifiers can rely on the data we do publish.